Skip to content
← Back to the project

CO₂ capture pre-design tool

Sizes a NaOH absorption column and the electrochemical cell that regenerates the solvent, and computes the cost of capturing each tonne. Every number says where it comes from.

Pre-feasibility (AACE class 5): for comparing options and orders of magnitude, not an engineering design.

The case

Starting point: Colombian cement plant (150,000 Nm³/h, 25 % CO₂)

Flue gas
Column and solvent
Cell and economics
Advanced options